FUNDED BY MEASURE O. This project consists of the construction of three stormwater catch basins and approximately 800 lineal feet of new reinforced concrete pipe with diameters ranging from 18 inches to 36 inches. This new pipe will redirect stormwater away from an existing drainage channel along the rear of 2465 Hall Canyon Road and 2462 Fernwood Drive.

Project Status 

In Construction 

Estimated Schedule

September 2020 - January 2021 

Contractor

Toro Enterprises

City Contacts

Zach Bryant, Assistant Construction Manager
Email 

Robert Payer, Senior Construction Inspector
Email  